Skip to content

Insights ·

Write post-launch editing rights and ownership into scope

After a website or mini program goes live, who may edit content, who may publish, and who owns the copy and assets should be written into the project scope, not left as a verbal understanding at handover. Beijing FIM Network Technology Co., Ltd. provides design and development for brand websites, mini programs and mobile sites. How to design the CMS so a marketing team can edit content is covered elsewhere; this article only covers which rights and ownership items belong in the scope.

Once a website or mini program is live, everyday changes — a line of copy, an image, a news post — are often made by the client. If the project scope only says "a content backend will be provided" and does not say who may edit after launch, who may publish, or who owns the copy and assets, the two sides can easily talk past each other at handover: one assumes it can already make changes itself, the other assumes content changes still need a separate request.

Beijing FIM Network Technology Co., Ltd. provides design and development for brand websites, mini programs and mobile sites. How to design the backend so a marketing team can edit content itself is covered in How to design a website CMS so marketing can edit content. This article does not repeat how fields, preview or rollback should work. It only covers which post-launch editing rights and ownership items should be written into the project scope in advance. Who switches old content during a redesign migration is covered in During a website migration, who cuts over and how to accept it. That is not the same as everyday editing after launch.

1. First, say who edits and who publishes after launch

The scope should distinguish people who can enter the backend from people who can publish to the live site, and should at least state:

  • Who is responsible for everyday edits. Name a role on the client side, such as marketing or operations, rather than only "the client will edit."
  • Who may publish to the live environment. Say whether editing and publishing are separate; if a review is required before publishing, say who reviews and what is reviewed.
  • What the vendor may still change after launch. Whether assistance is limited to an agreed maintenance period or number of changes, or whether the vendor will no longer change live content by default, should be written down, so post-launch access is not left at the same level as during the build.

These items belong in the written scope and the acceptance criteria, not only in a verbal briefing at training. The service itself follows the current Digital experience page; the project follows the written scope.

2. Then, say who owns the content, assets and backend configuration

Once the rights are clear, ownership should also be written down, or later staff changes and redesigns will not line up:

  • Who owns the copy, images and downloadable files, and who updates them after launch. If the client maintains them, say that the responsibility sits with the client. If the vendor still makes updates, say how many, within what time, and how requests are submitted.
  • Who receives the information architecture, permission settings and accounts at handover. After they are handed to the client, who may add or remove accounts and change permissions should be stated in the scope, not left in a personal note from the implementer.
  • Source files, font licences and later modification rights are not the same as everyday content edits. Those items should be listed separately, not mixed with "who may change a sentence in the backend."

Ownership is about where rights and duties sit. It is not a second complete delivery of every file. Which accounts and backends are handed over belongs on the delivery list; this article only requires that the scope already contains an ownership agreement.

3. What to check at acceptance once it is in the scope

At acceptance, check at least that the agreed roles can complete everyday edits, that an account without publish rights cannot release content to the live site, that the vendor's post-launch change boundary matches the scope, and that the ownership items are in a written document. Keep a record of the check. Rights that are not in the scope should not be agreed verbally on the acceptance day.

Who may edit after launch, who may publish, and who owns the copy and assets should be written into the scope at the start of the project. Once they are written down, everyday changes have a basis. If the scope only says that a backend was built, the parties will still argue about who has the right to edit and whose work a change counts as. Amounts and timelines follow the written agreement. This article does not invent prices or client names.

← All articles