Who cuts over old URLs and content, and how to accept it
In a website redesign migration, write down who will cut over old URLs and content, who will change DNS or hosting, and who will accept the switch. Agree a mapping list first, spot-check key pages and redirects at cutover, then sign against a written standard. Beijing FIM Network Technology Co., Ltd. provides brand-website design and development; roles follow the written project scope.
Going live with a redesigned website is more than finishing the new pages. Old URLs and content still have to be moved: which addresses stay, which redirect, which content is kept, and who checks it. If the plan is only “we will switch everything at launch,” the work often has no owner, and the result does not match what was expected.
Beijing FIM Network Technology Co., Ltd. provides design and development for brand websites, mini programs and mobile experiences. For the overall redesign steps, see Brand website redesign: steps from briefing to launch. For materials the client should provide before work starts, see What the client should give the studio before a brand-website redesign. This article covers only the cutover itself: who switches old URLs and content, and how to accept that switch.
1. Write down who does these three jobs
A migration involves at least three kinds of work. Do not assume the design or development team will do all of them:
- Who prepares and checks the content. Copy, images, downloads, news or case studies may be supplied by the client or prepared by the studio; someone must sign off. What will be kept from the old site, and what will be dropped, should be marked on a list in advance.
- Who cuts over the old URLs. Who produces the mapping of addresses that stay, redirect or come down; who configures that on the server or domain side; and who spot-checks after the switch.
- Who operates the domain, hosting and publishing rights. DNS, certificates, filing and CMS publishing rights often sit with the client or their host. Without written authorization, the studio should not assume it can change these settings.
Write all three into the project scope and name the people responsible. The client should also appoint one coordinator, so the studio is not only told to “handle it at launch.” Account and access materials should be provided before work starts; the earlier article lists them, and this one does not repeat that list.
2. Before the switch: a mapping list and a cutover window
There should be a mapping list confirmed by both sides, including at least: the old URL, the new URL or treatment (keep, redirect, or retire), whether the content has been moved, and who checked it. Addresses not on the list should not be decided on the night of the switch.
Also write down when the switch starts, how long it should take, how to roll back if something goes wrong, and who will be on hand. If a rollback cannot be described, it is too early to switch. If a quote rolls “content and migration” into one total, it is later hard to tell whether this mapping list was in scope; itemize that work in advance, as in Which line items to list so website or mini-program quotes can be compared.
3. Accept the switch itself, not only whether the new design looks right
Accepting the cutover is not the same as signing off the new design. Tick items against a written standard, rather than saying verbally that the site is live:
- Spot-check a sample of old URLs from the mapping list: redirects should land on the correct new page, retained addresses should still open, and retired addresses should no longer return the old content.
- Agreed content should appear in the agreed places; images and attachments should download; key forms should still submit.
- The home page, main sections and common entry points should open; include a mobile spot-check.
- Record problems as they are found: missing content, a wrong redirect, or a setting that was not switched—each goes back to the owner named earlier.
Acceptance should be confirmed in writing, including the sample that was checked and a deadline for items that failed. Failed items should not be counted as migrated. The scope of design services follows the design services page and the written project agreement.
For a migration of old URLs and content, first write down who cuts over, who changes the settings, and who accepts, then confirm the result against the mapping list and a written standard. After launch you will know who owns each part, and you will not mistake “the new site has been published” for “the old addresses and content have been connected.”